Mark tinkers with the kitchen, aligning cupboards and boxing in the soil pipe with plasterboard. Steve delivers the new dishwasher door handle and takes back the pan drawer dividers and internal drawer (as they won't fit a framed kitchen). Just as Steve leaves we discover that the pre-drilled holes for the dishwasher door in the are in the wrong place. Steve comes back out and sources a new door. The one that he delivers later in the day proves to be the wrong type of door...
Mark fits the remaining two spindles to the stairs and amends the understair cupboard door so that it doesn't catch.
Jim arrives to commission the gas cooker. He does this, fixes a leak on the gas fire and removes the radiator from D's old room (so that Millie can remove the wall).
Millie continues to work on the new master bedroom/ensuite. It's a messy day - removal of the exisiting wall. He looks like a mad man taking great delight in sawing the wall into pieces. It's removed by the end of the day. He also screws down some of the floorboards to stop them from creaking.
Whilst discussing shower options we discover that the two switches left over from the old airing cupboard are still live. Tom, who came back to collect his drill and rectify a problem with a two-way switch in the garage earlier in the day, is called back again to safely remove the switches.
Since we have no skip, John and Alan help to load the rubbish from the garage into Millies flat bed truck. This will go in the skip on another job in Peover. It's recycle collection day too, so the cardboard from the kitchen doors is taken away to be recycled.
Jack stops in to look at the remainder of the plastering work. This will take place tomorrow.
Zoe packs some bags, collects D from nursery and goes off to join her mum and dad in Penrith for a mid-week break at Centre Parcs.