Oh my God!!! We knew that there was going to be a lot of upheaval soon, but didn't realise that it was all due today.
It turns out that heating is far better than insulation. We wake up to condensation on the windows as the temperature in the house dropped to 16 degrees last night.
We'd been told that the windows were on order, but we were waiting on glass to arrive (we'd asked for the equivalent of the Pannabel/Glaverbel G glass that's in the exisiting windows because it's got a better float than Pilkington K). However we didn't realise that they were going to be installed today. They've decided to install the frames (with single glazing), whilst they're waiting for the glass to be delivered. This means that the window in Darcey's exisiting bedroom is removed and moved to the new back bedroom. The bottom of Darcey's window is then bricked up to a level more suitable for a bathroom window. We do our best to clear Darcey's room.
We also know that the stairs are on order, so we expect the old gable wall to come down soon. We had thought that we could sort through the bits and pieces under the stairs tonight and take them to Zoe's mums for storage tomorrow. Little did we know that the the wall is coming today! We rush around to try to protect more of belongings from dust.
Jim arrives to install the boiler. The electricians are on site too....
Subscribe to:
Post Comments (Atom)
1 comment:
Exciting stuff! Looks like your internet connection is remaining OK through all this upheaval, so you can give us up to the minute blog posts! :-)
Post a Comment