Friday, 21 November 2008

Friday 21 November 2008 - Day 110

Millie and Mark fit the soil pipe which runs from D's old room and down through the kitchen. Steve (from Howdens) brings a missing kitchen base unit, which is promptly installed by Mark and Millie.

By the end of the day all of the base units are fitted, as is the extraction unit. The extraction caused a bit of grief - as the extraction pipe is located too far to the right. there is a joist located in line with the chimney so a bit of fiddling about was required.

The thermostat that Mike ordered for the kitchen heating arrives.

Tom stops by to check the underfloor heating. Both Mike and Tom agree that a relay needs to be fitted to the circuit to ensure it works correctly.