Friday, 8 August 2008

Friday 08 August 2008 - Day 35

Late morning Lee arrived to replace a missing brick above the first floor window, he repointed some of the front apex. The drain hole that was left in the wall was bricked up. The scaffolding was removed and the site tidied. The steel work for the kitchen was delivered. Millie spent some time on site, fixing a temporary drainpipe to the rear gutter (weather forecast predicts rain tomorrow).

We will have to empty half of the kitchen over the weekend - On Monday half will be boarded up to allow joists to be put in place. We are also expecting the skip to be exchanged (always seems to be timed so that Darcey misses it)!